Skip to content
Meridian Clay
In development · 60%EstateSahel Urban Ltd

Guzape Heights

Plot 214 corridor, Guzape District, Abuja, FCT

From ₦95M

3 listings available

Sixty percent built. The roads and power are in; the clubhouse is not.

An elevated scheme on the upper Guzape slope, under active development since 2024. Phase one — 48 serviced plots, the access road, the transformer and the perimeter — is complete and occupied. Phase two is being built now.

We say plainly what is and is not on the ground. In: tarred roads throughout phase one, street lighting, underground cabling, the gatehouse and the perimeter wall. Not yet in: the clubhouse, the medical centre and the second borehole, all scheduled for the second half of 2027.

Buying here means accepting construction traffic for another eighteen months in exchange for a price that will not exist once the estate is finished.

Infrastructure delivered

60%

Under active development. Some facilities are in, others are scheduled. Target completion 30 Sept 2027.

The particulars

Stage
In development
Infrastructure
60% delivered
Size
8.5 hectares
Units
96
Available
22
Title
Right of Occupancy
Developer
Sahel Urban Ltd
Target
30 Sept 2027

Facilities on the estate

  • Perimeter fencing
  • 24/7 security
  • Gatehouse
  • Tarred roads
  • Street lights
  • Drainage
  • Electricity
  • Underground cabling
  • Borehole
  • Green areas

On a scheme still in development, some of the above are delivered and some are scheduled. Ask a consultant which is which before you commit — we will tell you plainly.